Our Projects
UNDER CONSTRUCTION
Holy Spirit Catholic College Lakemba New Administration
Client: Co-Wyn Building Group
Westmead Catholic Community GLA Building
Client: KANE Constructions Pty Ltd
Amity College Leppington Upgrade Stage 2
Client: Reitsma Constructions
Hornsby Quarry Lookout
Client: Ford Civil Contracting
COMPLETED PROJECTS
Parramatta Eels Kellyville Park PNRL Eels - Centre of Excellence & Community Sports Centre
Client: KANE Constructions Pty Ltd
Sublime Electrical was engaged as the Electrical Contractor to complete a D&C contract, encompassing the full electrical package. The scope included electrical infrastructure, power and lighting, communication network (including fibre optics, structured cabling, and MATV), dry fire system, PV system, security, access control, and CCTV.
The project involved offsite precast concrete fabrication incorporating electrical infrastructure which required precise and early co-ordination to seamlessly incorporate these provisions between precast concrete and in situ concrete being concurrently installed onsite.
Design focus energy consumption – to meet green star requirements and project requirements was an integral part of Sublime contribution to the Design Stage of the Project. The Centre of Excellence is a facility designed specifically for professional athletes, catering to their unique requirements to create an environment that enhances performance while maintaining aesthetic appeal.
Meticulous planning was necessary to ensure the seamless installation of custom linear lighting in the double-height kicking and gym areas. Bespoke wall lighting was incorporated within the aquatic and recovery spaces. Feature lighting was implemented in the social seating areas, boardroom, and front-of-house areas. Accent wall lighting was strategically placed around the building to highlight the pre-cast finishes and architectural structural steel. To complement the state-of-the-art athletic facilities, commercial laundries, kitchens, cafes, and back-of-house plant rooms were integral components of the project.
Built concurrently with the centre of excellence was the Community Facility. Features of this building include a 1500-seat grandstand, player tunnels with wall lights highlighting the custom murals, and an 80m linear light running through the middle of the football corridor.
Specific design focuses include provisions for professional media, with pathways installed to allow temporary cabling on match days, and specific power and communications provisions according to the project documents requirements
Parramatta Eels officially open the world’s largest rugby league Centre of Excellence | Eels
Excerpt from parramattaeels.com.au Thursday May 22nd 2025
Marist Catholic College - North Shore
Client: Lipman Pty Ltd
Sublime was engaged by Lipman under a Design and Construct (D&) contract to complete the electrical installation of Stage 2B of Marist Catholic College, North Sydney.
This stage of the project comprises the new installation of a new Main Switchboard that has been designed to feed the not only the existing school, but the future stages to come, a new underground staff carpark with EV chargers throughout, loading dock, Administration area, student services facilities, staff kitchen, library, GLA classrooms, science labs and a rooftop general area for student to enjoy.
Sublime’s comprehensive scope of works comprised
Installation of new Main Switchboard to service the whole school as well as new Main DistributionBoards and Distribution Boards for the new build
Submain cabling throughout the new build, as well as new submains for existing services throughoutthe school
Fully designed and calculated lighting installation
Cbus lighting control
General power requirements
Communications all installed to SCS specifications
Security Services8.94kW Photovoltaic System
St Narsai Assyrian Christian College
Client: Co-Wyn Building Group
Sublime Electrical was engaged in the electrical works for St Narsai Assyrian Christian College – Stage 4 by Co-Wyn Constructions.
The Electrical package encompasses a comprehensive upgrade and expansion of electrical, communications, security, and Dry fire across new and existing campus facilities.
The scope includes the design, supply, installation, testing, commissioning, and certification of internal and external power distribution, lighting (including Dynalite lighting control), emergency lighting to AS2293, structured data and fibre cabling, and security systems such as CCTV, access control, and intrusion detection.
The project also features a major infrastructure upgrade, including the installation of a new MDB and switchboards, underground services. Coordination with hydraulic and mechanical trades is essential for integrated services.
The works complied with AS/NZS standards, Green Star criteria, and maintain operational continuity for the school during construction. Full documentation, shop drawings, O&M manuals, and user training are required for final handover.
Barton Park Recreational Facility
Client: Ford Civil Contracting
Oxford Falls Grammar School - Field of Dreams
Client: Co-Wyn Building Group
The Oxford Falls Field of Dreams project was a comprehensive undertaking, involving the construction of a two-story facility that seamlessly integrates 79 parking spaces and ground-floor amenities. The first floor boasts competition playing courts with a distinctive canopy structure, an outdoor study area, and meticulously designed landscaping.
During the construction phase, our team was enlisted to enhance the project by transforming the outdoor study area into a sophisticated enclosed learning environment, housing library spaces and additional amenities on the first floor. To connect the facility with the existing campus, a bridge was constructed over the adjacent creek, providing convenient access.
Further elevating the project's appeal are the added features, including bleacher seating, honed concrete finishes throughout, and extensive landscaping. This collective effort results in a project that truly stands out.
Sublime, engaged by Co-Wyn, played a pivotal role by providing a Full Electrical Package, which encompassed the following key elements:.
Installation of inground conduits and pits
Implementation of a new Submain and Fibre Backbone Cabling
Installation of new internal, emergency, and external lighting
Provision of general power outlets
Inclusion of specialty outlets for equipment
Implementation of Structured Cabling
Installation of Dry Fire systems
Integration of Security, Access Control, and CCTV cameras into the existing school system.
With these additions, the Oxford Falls Field of Dreams project not only meets but exceeds expectations, showcasing a harmonious blend of functionality and aesthetic appeal.
Town Park Wolli Creek
Client: Glascott Landscape and Civil
Sublime Electrical are proud to deliver a comprehensive electrical installation for Wolli Creek Town Park, enhancing community spaces with modern, efficient, and safe lighting.
Our scope includes the supply and installation of a main switchboard, lighting and power subcircuits, light poles, external power outlets, and Dynalite lighting control system.
Mount St Benedict’s College - Refurbishment of MSB Centre
Client: Grindley Interiors Pty Ltd
Sublime were engaged under a design and construct contract to complete the full electrical services package associated with sensitive refurbishment of this 4 level heritage building in the college.
The scope of works included:
Switchboards and Submains
Communications and structured cabling
Lighting
Solar Car Park Lighting
Dynalite lighting control system
Power
Security, access control and CCTV
Cranbrook - Perkins Refurbishment
Client: Co-Wyn Building Group
Sublime was engaged by Co-Wyn Building with the Design and Construct (D&C) contract for the refurbishment of the Perkins Building, a heritage-listed structure erected during the school's inaugural year in 1918.
Sublime's comprehensive scope of work comprised:
Meticulous installation of new internal, emergency, and external lighting
Thoughtful deployment of general power outlets
Strategic implementation of Structured Cabling
Rigorous execution of Dry Fire systems
Seamless integration of Security, Access Control, and CCTV cameras.
Particular emphasis was placed on meticulous planning and consideration to ensure that the introduction of new services did not compromise the historical character of the building. Sublime collaborated closely with the Heritage Consultant on the project, demonstrating a commitment to preserving the architectural legacy while seamlessly incorporating modern electrical systems.
Oakhill College Canteen
Client: Rohrig Constructions
Sublime were engaged by Rohrig Constructions to undertake the Electrical Package for construction of the Oakhill College Canteen, a pivotal project at the core of the school's infrastructure.
Sublime's Electrical Package for this project encompassed:
Installation of inground conduits and pits
New Submain and Fibre Backbone Cabling
Installation of new internal, emergency, and external lighting
General power outlets
Provision of specialty outlets for appliances
Structured Cabling
Implementation of Dry Fire systems
Integration of Security, Access Control, and CCTV cameras.
By executing this comprehensive Electrical Package, Sublime not only contributed to the successful completion of the School Canteen but also ensured that the electrical infrastructure met the highest standards of functionality, safety, and technological integration within the heart of the school campus
Eileen O’Connor Catholic School
Client: Co-Wyn Building Group
Sublime were engaged by Co-Wyn Building to complete the electrical services newly renovated block B building.
Sublime's comprehensive scope of work comprised:
Installation of the new incoming conduit and pit system
Submain cabling
General lighting and power services
Communications, Dry fire and Security services
Harold Park Open Space
Client: Ford Civil Contracting
Sublime were engaged on this fully designed project to complete the electrical services associated with the construction of the park, associated shelter structure, and pedestrian bridge.
The park which is central to the new Harold Park Residential development and was constructed to City of Sydney Council Specifications consisted of underground reticulation to various switchboards, irrigation panels and pump stations, event power boards, over 60 pole lights, lighting to the picnic shelter, feature LED strip lighting to retaining walls and handrail lighting integrated into the pedestrian bridge.
St Michael’s Catholic Primary School
Client: Co-Wyn Building Group
Sublime was engaged by Co-Wyn Building under a Design and Construct (D&C) contract for St Michael’s that was completed in two stages.
The first stage involved refurbishment the existing Block A classrooms, while the second stage involved constructing a new two-story education facility.
The newly build facility includes a a large undercroft area, amenities, GLA classrooms, and learning areas.
Sublime's comprehensive scope of work comprised:
Installation of the new incoming conduit and pit system
Submain Cabling
General lighting and power services
Communications, Dry Fire and Security Services
Good Samaritan College
Client: Co-Wyn Building Group
Sublime Electrical were engaged by Co-Wyn Building to complete the electrical works associated with alterations and additions to the existing school including temporary teaching spaces, a first-floor addition and associated alterations to the existing TAS building and alterations to an existing two story classroom building.